- Steel
- 46t
A 32m weathering-steel truss footbridge lifted into place in a single night.
Fabricated in three sections at our works, trial-assembled, then transported and spliced beside the river. The finished bridge was lifted in by a 350t mobile crane during a four-hour overnight road closure.
Every butt weld was ultrasonically tested and signed off to EXC3 by an independent inspector.
Scope of works
- 01Weathering steel truss
- 02EXC3 fabrication
- 03Full-penetration welds, 100% UT
- 04Crane lift coordination