Don Valley Footbridge
← All projects
StructuralSheffield2024

Client
Sheffield City Council
Location
Sheffield
Year
2024
Steel
46t

A 32m weathering-steel truss footbridge lifted into place in a single night.

Fabricated in three sections at our works, trial-assembled, then transported and spliced beside the river. The finished bridge was lifted in by a 350t mobile crane during a four-hour overnight road closure.
Every butt weld was ultrasonically tested and signed off to EXC3 by an independent inspector.

Scope of works

  • 01Weathering steel truss
  • 02EXC3 fabrication
  • 03Full-penetration welds, 100% UT
  • 04Crane lift coordination