Kelham Works Mezzanine
← All projects
StructuralSheffield2025

Client
Kelham Logistics
Location
Sheffield
Year
2025
Steel
84t

A 1,200 m² two-tier mezzanine installed while the warehouse stayed live.

Kelham Logistics needed to double their pick-face capacity without closing the warehouse for a single day. We designed the mezzanine around their racking layout and phased the erection across twelve night shifts.
All connections were bolted to avoid hot works on the live floor. The steel was primed and fire-protected off site, then lifted in with two compact crawler cranes.

Scope of works

  • 01Design & connection detailing
  • 0284 tonnes of structural steel
  • 03Intumescent coating
  • 04Night-shift erection
Next project ›Don Valley Footbridge
Request a quote

Send us drawings, photos or a rough sketch. You'll have a fixed-price quote back within one working day.